Booklet 'ITED: The Knowledge and Information Society in construction'
The ITED REGIME
In a society where communications are taking on ever an increasing importance, it is fundamental to develop infrastructure that guarantees access to current and future services, in a way that is simple and effective.
ITED is the regime governing the planning and installation of telecommunications infrastructure in buildings and their links to the public telecommunications networks, as well as the activity of installation certification. It is regulated by Decree Law no. 59/2000 of 19 April and supported technically by the ITED Manual and associated procedures.
Since 1 January 2005 it has been mandatory that all planning of telecommunications in buildings are made in accordance with the ITED regime.
By creating conditions that facilitate the existence of broadband in new buildings, the ITED regime promotes competition between operators and the technological upgrade of the communications sector.
Follow each step in the implementation of an ITED plan and participate actively in this process!
1 - When planning the construction of a building, the property developer/owner must hire an ANACOM registered ITED designer, to develop the telecommunications plan.
Note: the list of technical ITED is available at www.anacom.pthttp://www.anacom.pt/render.jsp?categoryName=CATEGORY_ROOT&languageId=1
2 - The project must be submitted to the Municipal Council accompanied by designer's disclaimer, which waives prior appraisal by the municipal services. No later than three days after the issuance of the disclaimer, the designer should send a copy to ANACOM.
3 - Once the construction license is obtained and the implementation work started, the developer should manage contact between the designer, installer and certification authority (or installer-certifier), ensuring supervision of the works and compliance of the installation with the applicable standards.
Note: the list of certifying authority registered with Anacom is available at www.anacom.pthttp://www.anacom.pt/render.jsp?categoryName=CATEGORY_ROOT&languageId=1
4 - During the works, the installer will use equipment and materials that comply with the requirements contained in the ITED Manual. Following installation, the installer produces the report on the functioning tests, in which he/she may be aided by the certification authority.
5 - Upon completion of the installation, the certification authority conducts the appropriate tests, prepares the inspection report and issues the respective certificate of conformity.
6 - No later than 3 days after its issue, the certification authority must send a copy of the certificate of conformity to ANACOM. The original is given to the property developer/owner and a copy to the installer.
7 - The issuance by the Municipal Councils of the license to use the buildings is subject to the display of the ITED certificate of conformity.
MUNICIPAL COUNCIL
8 - It is also essential to have the ITED certificate of conformity so that an operator can supply telecommunications services to the building (fixed telephone service, cable television service, etc.).
For more information please visit the site www.anacom.pt
http://www.anacom.pt/render.jsp?categoryName=CATEGORY_ROOT&languageId=1
ITED
For more information visit the website: www.anacom.pthttp://www.anacom.pt/render.jsp?categoryName=CATEGORY_ROOT&languageId=1
ITED
The Knowledge and Information Society in construction
Public Attendance:
FREEPHONE: 800 20 66 65
http://www.anacom.pthttp://www.anacom.pt/render.jsp?categoryName=CATEGORY_ROOT&languageId=1 info@anacom.pt
Head Office:
Av. José Malhoa, no. 12
1099-017 Lisboa
Tel.: 21 721 1000
Fax: 21 721 1001
Barcarena:
Alto do Paimão
2730-216 Barcarena
Tel.: 21 434 8500
Fax: 21 434 8501
Porto:
Rua Direita do Viso, 59
4250-198 Porto
Tel.: 22 619 8000
Fax: 22 619 8001
Azores:
Rua dos Valados 18 - Relva
9500-652 Ponta Delgada
Tel.: 296 302 040
Fax: 296 302 041
Madeira:
Rua Vale das Neves no. 19
9060-325 Funchal
Tel.: 291 790 200
Fax: 291 790 201
|
|
Consultation on the draft decision on the results of the audit to PTC's universal service net costs (2007-2009) - comments until 22.05.2013 |
ANACOM Conference 2013 - Financing the future, 01.07.2013 |
|
World Radiocommunication Conference 2015 (WRC-15), Geneva, 2-27.11.2015 |
ARCTEL-CPLPhttp://www.arctel-cplp.org/ |
Positions, clarifications and statements issued by ANACOM between 2004 and 2013 |
|
Access the services which we provide electronically |
FAQ on Audiotext, Digital Terrestrial Television - DTT, International Roaming, Licences for land mobile service private radiocommunications networks, Local Loop Unbundling, Message-Based value Added Services, National Numbering Plan, Operator Portability, R&TTE Regulatory Framework, Telephone Service at a Fixed Location and Universal Service, VoIP |