2. Analysis


In its letter of 7 March 2017, MEO refers that annual costs of submarine cables on which MAM and Inter-island rings and associated activities rely are determined in the scope of its Cost Accounting System (CAS) in the course of the first half of the year following that to which they relate, being provided to ANACOM by 30 June. In this context, MEO informed that, at that time, the determination of results for 2016 was still underway, and it was not possible for the company to provide final values of submarine cable costs of for that year. For this reason, MEO submitted cost data with final values established for 2015 and estimated values for 2016.

As such, this analysis uses MEO cost estimates for 2016.

To avoid an analysis based on cost estimates, in the future the annual review of prices of MAM and Inter-island lines shall take place in the second half of the year.

Notes
nt_title
 
1 The average annual pool decreased from 8 to 4 traditional lines since 2015.
2 MEO informed that, with the adoption of the Network Costing Model (NCM), costs are broken down to a more elementary level at the beginning of the procedure for the determination of CAS results. There no longer is an overall activity for submarine cables with landing points in Portugal, there are different activities for each submarine cable. In this specific case, activities concerned are “MAM Submarine Cables” and “Inter-island Submarine Cables”. This model has been fully integrated in MEO’s CAS, however the rationale for cost allocation is different from the former model, and as such, activities considered are different. For this reason, MEO declares that it is not possible to provide costs of MAM and Inter-island lines in the format required in ANACOM’s request for information.
3 Includes investment costs (depreciation and cost of capital) and O&M costs.
4 Estimated by ANACOM on the basis of data submitted in MEO letter, corresponding to:
(a) [BCI] [ECI] Gbps connected/reserved for MEO in the MPLS network;
(b) [BCI] [ECI] relying on the SDH network; and
(c) [BCI] [ECI] relying on DWDM.

5 Which include the exchanges of Carcavelos (01CV01), Picoas (01LX00) and Boa-Hora (01LX22), in the Mainland, the exchange of Fajã de Baixo (96PD02), in S. Miguel, in the Azores and the exchange of Nazaré (91FX03), in the Madeira Island, as well as the exchange of Ponta Delgada (96PD01) in the Azores.
6 That is, a connection/section between the Mainland and the AR of the Azores (ARA) or between the Mainland and the AR of Madeira (ARM), or between the ARA and the ARM.
7 Price set further to ANACOM’s decision of 1 September 2016, on the analysis of Market 4.
8 Prices published in Annex 2 to RELLO (version 15). To prices of MAM Ethernet section/line must be added prices of the respective land trunk segments (where appropriate) and of internal extensions/or terminating segments.
9 Where operators request one or two MAM sections/lines with a given capacity to be secured, MEO must propose an appropriate solution; however, the price must not exceed, in any case, three times the price due for contracted non-secured sections/lines.
10 Vide footnote No. 5.
11 On the basis of data submitted in MEO’s letter of 7 March 2017.
12 Includes investment costs (depreciation and cost of capital) and O&M costs. MEO stressed that, on account of the expected migration from the MPLS network to the SDH network, investments were made during 2016, for the purpose of expansion of DWDM capacity of Inter-island submarine cables, that amounted to [BCI] [ECI] Euros. This investment was capitalized by MEO in December 2016, thus the estimate only considers a one-month depreciation and the respective cost-of-capital, amounting to [BCI] [ECI] Euros.
13 The estimate made by MEO for MAM lines also applies to Inter-island lines.
14 Prices published in Annex 2 to RELLO (version 15). As is the case with MAM lines, to prices of Inter-island lines must be added prices of the respective land trunk segments (where appropriate) in terminal islands and of internal extensions/or terminating segments.